1
Dr Tim Moore July 2014
www.aicarbon.com AI Carbon
Evaluation of carbon storage and potential value of improved
ecosystem services
provided by the Coorong, Lower Lakes & Murray
Mouth Rehabilitation Project
A prefeasibility study of pathways to creating ongoing value based on environmental improvement, economic development and social engagement in natural resource management
2 Disclaimer
The information provided in this report is not to be used or interpreted out of the provided context, and no inference is to be made from it. Although reasonable care is taken to make the information accurate, Engine Room Consulting or AI Carbon do not make any representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose. Before using the information, you should carefully evaluate its accuracy, completeness, currency and relevance for your purposes.
The information is general in nature and is not tailored to the circumstances of individual farms or businesses. It does not constitute financial, taxation, legal, business, scientific, agronomic or farm management advice and does not deal with the approvals that may be required in order to access Crown land or any planning and development approvals that may be required. The information is provided on an “as-is” basis, and Engine Room Consulting and AI Carbon have no obligation to update or modify its content following release. It is recommend before making any significant farming, financial or business decisions, you obtain appropriate advice from qualified professionals who have taken into account your individual circumstances and objectives.
3
Executive summary
The costs of facilitating adaptation to future climate change and associated environmental changes may be offset by value created by quantifying and selling the benefit associated with carbon sequestration. Additional values associated with biodiversity enhancement and protection, and important ecological functions that have potential economic values need to be considered in future environmental rehabilitation projects. Assessment of ecosystem services and functional values may represent significant value to society that is not currently considered when developing and implementing environmental management actions.
In recent times, the region has suffered significant negative environmental, economic and social impacts as a result of historical and upstream water and land management decisions. The Murray Futures Coorong and Lower Lakes Recovery Program was designed in partnership between Australian, South Australian and Local Government and representative community groups. The plan is intended not to be a “static” plan, but one that is adaptive and responsive to learnings and opportunities that emerge through collaboration, research and on-ground applied learnings. The over-arching intent of the plan is to build resilience into the social, environmental and economic systems of the region by improving environmental quality and ability to respond to change.
Within that broader context, this report was developed as a starting point to come to an understanding of the sequestration potential and carbon market potential as a source of income from an ecological service provided by the Coorong, Lower Lakes & Murray Mouth rehabilitation project.
Specifically, the project was undertaken to 1) consider possible economic value of carbon sequestration achieved by biodiverse revegetation in the Coorong, Lower Lakes & Murray Mouth region, and 2) consider potential opportunities to realise some of that value given current policy settings. The decision to participate or not in any market requires an understanding of demand and supply drivers, costs of production and an understanding of the broader political and policy framework which the market exists within. This project has been developed within the broader context of Australia’s commitments to protect important wetlands (Ramsar Convention), reduce greenhouse gas emission levels (Kyoto Protocol) and to conserve and protect biological diversity (Rio Convention).
Under the Kyoto Protocol, Australia agrees to apply internationally developed rules and protocols regarding accounting for greenhouse gas emission sinks and sources. This report applies the general rules for carbon sinks in Land, Land Use Change & Forestry (LULUCF), as developed by the Intergovernmental Panel on Climate Change (IPCC) 2006 Guidelines for National Greenhouse Inventories, Volume 4: Forests. The report also highlights there is a need for the National accounting approach to be updated in wetlands to reflect the recently released IPCC report 2013 Supplement to the 2006 IPCC Guidelines: Wetlands. It does not currently appear the National Inventory and related legislation are consistent with those updated international guidelines in the case of wetlands emission accounting.
Translating the international accounting greenhouse gas sink and source protocols to the level of a
“project” such as the CLLMM revegetation project, a series of analyses of what type of planting was put down when, and where, and over what area were undertaken. This was done to attempt to come to an understanding of what impact the project had in terms of carbon dioxide equivalent sequestered in biodiverse plantings. The project level accounting aimed to meet the following criteria: the results must be relevant, complete, consistent, transparent, accurate and conservative. A series of
4 assumptions were required to be made to undertake the analyses. These assumptions were detailed and specified to allow for assessment of project report findings to be judged against the above criteria.
Data for analyses were supplied by the Department of Environment, Water & Natural Resources Major Project CLLMM team.
The total area planted out to “forest” is expected to be 1,578 hectares to the end of 2014, with 295 hectares of non-forest terrestrial plantings and 1 hectare of non-forest aquatic revegetation.
Two different carbon stock change models were applied to determine the likely range of carbon sequestration. The first was the Reforestation Modelling Tool (RMT), as supplied by the Australian Government Department of Environment. This model is known to be poorly suited to estimating carbon stock change rates in environmental plantings, and represents a limited functionality version of the Full Carbon Accounting Model (FullCAM). The second model was developed, in part, by South Australian Department of Environment, Water & Natural Resources (the “Hobbs model”), and represents locally calibrated data that will eventually propagate into the FullCAM. The RMT suggests annual average carbon sequestration in the area of 1.5tCO2e/ha/year for the next 30 years across the terrestrial forest areas planted. The Hobbs model suggests 7.71 tCO2e/ha/year as the average rate for the same plantings. Under the RMT forecasts, the terrestrial forests are expected to sequester around 70,000 7.71 tCO2e to 2040, while the Hobbs model suggest around 300,000 tCO2e over the same period. This is roughly equal to taking 90,000 cars off the road in Australia for a whole year. Analysis of current Australian Government legislation and policy suggests that the Hobbs model should be able to be applied in the foreseeable future (e.g. within 6 months of this report being released). The RMT model could be used immediately to launch a carbon farming project.
Using the carbon stock forecasts, and again using specified and detailed assumptions, there is a real possibility that the potential revenues that could be gained across the entire planted area could exceed project costs. This is a first order or preliminary examination that requires more detailed technical and commercial investigation. The project valuation is seen to be sensitive to both changing carbon price and estimates of sequestration per hectare. There is strong potential for this project to return revenue to landholders in the form of biodiversity incentive payments, which could be as high as $1m to participating land managers out to 2030. This may represent significant additional opportunities for the Natural Resources SA Murray-Darling Basin if they become the project owner, and are able to ensure revenue in excess of costs was returned to important environmental initiatives, rather than to general revenue. This model represents an innovative market based instrument that is consistent with the Kyoto Protocol and the Rio Convention on finding new ways to develop important environmental outcomes.
Further opportunity may exist be applying the IPCC 2013 Wetlands Accounting guidance to see how improved river level and wetland management has influenced greenhouse gas emissions, which this project didn’t not have the scope to undertake. This paper has also identified significant benefits delivered to society as a whole (as greenhouse gas emissions sequestered) undertaken by private land managers undertaking changed land management on their properties. This may also have ancillary benefits to agricultural and horticultural activity on those private lands. In the context of a “regional marketing plan”, the “carbon, biodiversity, food, fibre, wine, and community engagement” that the CLLMM project helped develop helps to create a compelling for any party in the voluntary market seeking “high quality” carbon credits. This may then create a pathway to market for land managers
5 who seek to create carbon neutral produce, or who are seeking to attract buyers who are interested in the “green” production approach.
Following on from the findings of this report, future actions should include:
• examination of pathways to market for carbon and biodiversity offsets,
• reconsidering how greenhouse gas accounting is undertaken in the CLLMM Ramsar Wetlands area using the most up to date procedures,
• developing a more detailed understanding of broader economic benefits of environmental improvement projects (across ecosystem services as regulation of flooding and drying cycles, primary production and biodiversity maintenance), and
• consideration of the role of environmental flows in stimulating new biodiverse native carbon forests.
This study is important in that it has enabled the quantification of direct economic benefit of ecosystem services that are being delivered mostly on private lands as a result of public private partnerships and investment into environmental rehabilitation. Investigating more than just the one ecosystem service (carbon sequestration) directly quantified here will doubtless enable natural resource managers to provide better cost: benefit evaluations to base judgements on how to direct natural resource management in the future to deliver maximum benefit.
6
Glossary and important definitions
afforestation means the planting of a new forest
Article 3.3 (Kyoto Protocol) means the emissions or removals resulting from land which was converted, after 31 December 1989, to or from a forest through afforestation, reforestation or deforestation. Australia has defined a forest as an area with:
• tree crown cover of 20% canopy
• minimum land area of 0.2 hectares, and
• minimum tree height of 2 metres
Article 3.4 (Kyoto Protocol) covers land use that is not afforestation, reforestation or deforestation.
This includes:
• forest management
• cropland management
• grazing land management, and
• revegetation.
carbon pool means the living biomass and the dead organic matter.
carbon stock change means the difference in the carbon stock in the relevant carbon pools in an area over a specified period of time.
deforestation means the clearing of a forest
densely stocked planting means plantings where, after the first 3 years post-establishment, the number of individual trees (excluding ground-cover plants and grasses) per hectare remains relatively high at >1,500 individuals per hectare, in mixed-species environmental plantings
planted area
The spatial area defining the planting that is used to estimate carbon abatement where:
a. For blocks or belts in which plants are established in rows:
i. the location of the outside edge of the long axis of the rows is a distance from the outer row of stems one half of the average spacing between trees within rows within the planted area;
ii. the location of the outside edge perpendicular to rows is a distance from the outer row of stems one half of the average spacing between trees within the planted area;
iii. the location of an edge internal to the planting perimeter bordering on an exclusion area is a distance of one half of the average width of the rows within the planted area from the outermost stem; and
iv. requirements for the minimum area of the planting and exclusion areas are set out in the CFI Mapping Guidelines; and
b. For blocks or belts in which plants are established randomly (i.e. not in rows):
i. the location of any outside edge from the outer stems is equal to zero meters from the outer stems;
ii. the location of an edge internal to the planting perimeter bordering on an exclusion area is equal to zero meters from the outermost stem; and
iii. requirements for the minimum area of the planting and exclusion areas are set out in the CFI Mapping Guidelines;
7 project area means the subjectively defined spatial area defining the planting/s managed under the project including
exclusions and spaces between adjacent linear plantings. Note: Planted area, not project area is used to estimate carbon abatement.
mixed-species environmental planting
A planting that consists of a mixture of tree and shrub species that:
a. are native to the local area of the planting; and b. are sourced from seeds:
i. from within the natural distribution of the species; and
ii. that are appropriate to the biophysical characteristics of the area of the planting and
c. may be a mix of trees, shrubs, and understorey species where the mix reflects the structure and composition of the local native vegetation community, and
d. are established through tube stock, direct seeding or broadcast seeding. That is it does not include mixed-species regenerated naturally without planting seeds or seedlings (i.e. natural regeneration or regrowth).
reforestation means the replanting of a forest that has been lost for any reason
revegetation means replanting by direct seeding or use of tube stock to replace non-forest vegetation where the vegetation covers a minimum area of 0.05 hectares and does not meet the definitions of afforestation and reforestation contained here
non-forested land is land that does not have trees situated on it that: (a) have attained, or have the potential to attain, a crown cover of at least 20% across the area of land; and (b) have reached, or have the potential to reach, a height of at least 2 metres.
Wetland accounting
The 2013 Supplement to the 2006 IPCC Guidelines for National Greenhouse Gas Inventories:
Wetlands (Wetlands Supplement) provides methods for estimating anthropogenic emissions and removals of greenhouse gases from lands with wet and drained soils, and constructed wetlands for wastewater treatment. It follows the same approach to estimating emissions and removals as the 2006 IPCC Guidelines for National Greenhouse Gas Inventories (2006 IPCC Guidelines). The report has been developed by an international team of authors who were selected by the Bureau of the IPCC Task Force on National Greenhouse Gas Inventories (IPCC TFI). It has undergone a multi-stage review process involving expert reviewers and governments and was presented to IPCC member governments for adoption and acceptance in October 2013.
The Australian Government has chosen to exclude wetland accounting from eligibility to participate in the CFI and ERF. It is not clear whether the Australian Government has elected to update national Greenhouse Gas Emissions Inventory (NGGI) to include the most recent IPCC guidance on wetland accounting.
8
Table of Contents
Executive summary ... 3
Glossary and important definitions ... 6
1. Introduction & background ... 10
International and national significance and relevant policy settings ... 12
2. Measuring carbon stock change, national and international accounting rules... 13
3. Project level carbon forecasting ... 14
3.1 CLLMM planting program and design ... 15
3.2 Estimating carbon sequestration rates ... 15
Assumptions ... 15
3.3 Results of carbon stock change assessment ... 18
3.4 Summary of carbon stock change forecast and way forward ... 19
4. Application of carbon quantification methodologies & project level carbon accounting ... 20
4.1 Environmental Plantings ... 20
4.2 Afforestation & Reforestation ... 21
4.3 Quantifying carbon sequestration by permanent native mixed species environmental or mallee plantings using the Full Carbon Accounting Model ... 22
4.4 Verified Carbon Standard Coastal wetlands methodology ... 23
4.5 IPCC Guidance on wetland carbon accounting ... 23
4.6 Summary of project level accounting issues and way forward ... 24
5. Project development costs and possible returns... 26
General context ... 26
Development and implementation costs versus possible revenue ... 26
Assumptions ... 26
6. Analysis of Direct Action and Emission Reduction Fund: barriers and opportunity ... 29
7. Project appraisal, summary and recommendations ... 33
References ... 35
Appendix 1. Evaluation of carbon storage in CLLMM project area technical report ... 36
1. Introduction ... 37
2. Purpose ... 37
3. Materials supplied... 37
4. Tabs ... 38
5. “Year” tabs (2010-2014) ... 38
6. Species planted tab ... 38
9
7. Database download ... 39
8. Forest classification ... 39
9. Areas by year by type ... 40
10. Carbon raw data ... 40
11. Carbon raw data ... 40
12. Carbon calcs ... 40
Appendix 2. Potential commercialisation pathway for CLLMM ... 42
10
1. Introduction & background
The impacts of prolonged drought and water over-allocation across the Murray-Darling Basin left the internationally significant Coorong and Lower Lakes wetlands on the brink of environmental collapse.
Positive relationships built between Federal, State and local partners, including the Ngarrindjeri native title holders have allowed significant environmental improvement projects to be developed and implemented since 2009, consistent with the Long Term Plan (Securing the Future: a long-term plan for the Coorong, Lower Lakes and Murray Mouth).
The Murray Futures Coorong and Lower Lakes Recovery program has delivered a range of projects to address environmental issues facing the region, such as salinity, acid sulphate soils and loss of habitat, and rebuild a healthy ecosystem that can better adapt to changing conditions in the future. During the next 20 years, the long-term plan will work towards introducing more variable water levels and building resilience in the region's environment so the site can recover from unprecedented low water levels, salinity and acidification and adapt to changing conditions. The actions proposed in the plan will take account of variables such as inflows and climatic conditions, as well as information gathered and lessons learned from previous actions.
It is intended that the plan will be regularly reviewed based on emerging information, science and knowledge, as well as being responsive to cultural and community guidance, and the development of a close working relationship with the Ngarrindjeri Regional Authority. As part of this adaptive learning approach to management, there is strong interest from stakeholders with regards to valuation of the improvements to the environment from economic and marketing perspectives. It is expected that activities under the Recovery Program will impact several significant greenhouse gas sinks and sources. The underlying interest from stakeholders is to determine whether there are alternative economic values that could be achieved by quantifying environmental improvement values in terms of carbon markers or payment for ecosystem services. Even if direct economic values cannot be directly achieved (e.g. by sale of environmental improvement commodities, such as carbon or biodiversity credits), there may be secondary economic values associated with the marketing of produce from the region being related to environmental improvements. For example, there may be brand or product differentiation where the producer can show a link with how they manage their land and enterprise to maximise both profit and environmental conditions, rather than purely managing for profit that may lead to environmental degradation.
One often mentioned market in the payment for environmental services discussion is in carbon credit production and sale: carbon trading. The service provision is the storage of carbon drawn from the atmosphere by biodiverse revegetation schemes, thereby serving to slow the impacts of human induced climate change. Such biodiverse plantings also deliver ancillary benefits to biodiversity, improve water and nutrient cycling processes, and allow for enhanced economically productive uses of the land. The historic role of carbon within the Lake sediments is a very important one for the CLLMM site. Carbon is in limited supply within the lake sediments which has resulted in reduced ability for the ecosystem to cycle nutrients and to facilitate sulfate reduction.
11 The idea of whether or not to become involved in the Carbon Farming Initiative (CFI, the regulated carbon credit producing scheme in Australia) has become a vexed issue for many landholders and land management agencies across Australia. One the one hand, there appears to be opportunities to raise additional sources of capital for management and of improved land management practice through the sale of carbon credits related to environmental rehabilitation. New sources of capital are always welcome to land management agencies that have traditionally struggled to attract and maintain long- term funding arrangements to manage rehabilitation activities. On the other, the development of carbon markets is slow, fragmented, and subject to significant pricing volatility and regulatory uncertainty. Overlaying these concerns is the potential for long term obligations to rest on land title, with the perception of risk of devaluing land values or restricting future use options for the rehabilitated land.
In short, while the upside of receiving revenue for the delivery of biodiverse carbon sequestration outcomes is apparent, the risks associated with the unknown conditions that surround participation in the carbon market create real uncertainty for stakeholders.
This is particularly true as the complexity of issues in deciding to participate in a market based opportunity to fund capital and operational costs of environmental rehabilitation ranges across political, scientific, financial and legal aspects. Adding to the complexity is the typical lack of familiarity of both landholders and land management agencies in dealing with complex financial instruments and unfamiliar market conditions, and constantly changing political tides.
To make the situation worse, the idea of carbon trading as both a policy based instrument to deal with human induced climate change is often muddied in stakeholders minds by concern raised in the mainstream media over “whether climate change is real” and the idea that “carbon trading is just there to make money for the traders, the big banks and the middlemen (financial services sector)”.
Finally, there is a dearth of competent advisory services that can provide balanced views of risk and opportunity for land & natural resource managers regarding participation in carbon markets to finance development and ongoing maintenance of landscape rehabilitation.
Without any doubt, the situation surrounding the CFI and the evolving policy environment around the Australian Governments’ Direct Action and Emission Reduction Fund is complex.
However, the Department of Environment, Water & Natural Resources (DEWNR), Major Projects Branch has identified that complexity does not mean that no action should be taken.
This project (“Carbon Sequestration and Market Value from the CLLMM Revegetation Program Project”) developed by the Program Leader, Partnerships and Landscapes (Russell Seaman) within DEWNR, indicates an interest in dealing with the very broad issues that need to be considered in assessing potential viability of participation in market based opportunities associated with environmental management and improvement. In this case, environmental improvements are the outcomes that have occurred as a result of the significant investment in native habitat restoration that has been undertaken in the CLLMM region. This project has been proposed to come to an understanding of the sequestration potential and carbon market potential as a source of income from an ecological service. In effect, the project takes the general form of a business feasibility study that
12 takes into account the Major Projects Branch interest in the opportunity to leverage future value from activities undertaken to date. We consider it important to also provide broader contextual understanding on how the information and knowledge developed through this project may apply more broadly to the operations of DEWNR. The resultant report and presentation will be important in presenting a clear understanding of risk and opportunity for DEWNR & regional stakeholders.
This project effectively takes form of pre-feasibility study that seeks to determine the benefits of the activity to date, to identify possible ways that the identified benefit can be described, communicated and valued. The project has been developed to determine if there is a plausible pathway to also create additional economic value or identify and value indirect economic value that could contribute to ongoing rehabilitation and improvement of environmental conditions in the region.
International and national significance and relevant policy settings
The project presented here is consistent with a suite of obligations and intents to protect, conserve and improve the environment and quality of life of people, and to use economic innovation to drive these outcomes. The key policy drivers for the development of this project are:
• Australia has obligations to conserve and protect wetlands of international significance (Ramsar)
• Australia is seeking to reduce its greenhouse gas emissions (Kyoto, Direct Action & Emission Reduction Fund, Carbon Farming Initiative)
• Australia is seeking to conserve and protect biodiversity through innovative approaches (Rio Convention on Protection of Biological Diversity innovative financing mechanisms;
Environment Protection and Biodiversity Conservation Act)
• Australian Government in partnership with the States and Territories is seeking to increase rates of Indigenous Economic Participation and reduce rates of disadvantage between Indigenous and non-Indigenous Australians (Closing the Gap, National Partnership on Indigenous Economic Participation)
• Australian Government is seeking State based proposals for participation in the Emission Reduction Fund
• Significant investment is occurring within the riverine landscape to restore ecological function of wetlands and floodplains. This includes a substantial restoration program in the Lower Murray.
• The implementation of the Basin Plan over the next few years is a key driver in restoring river health and promotion of localism which links to economic productivity lifecycles.
13
2. Measuring carbon stock change, national and international accounting rules
Australia, like all other countries that have commitments to the Kyoto protocol, have agreed to follow specified protocols and rules about how to go about accounting for greenhouse gas emission sources and sinks across all sectors. One of the most complex sectors to confidently estimate the level of emissions moving into and out of greenhouse gas sinks and sources is the agriculture and land management sector. The Intergovernmental Panel on Climate Change (IPCC) provides technical advice on, amongst other things, how to quantify emission sinks and sources in the land sector (agriculture, forestry and other land use “AFOLU”/land use land use change & forestry “LULUCF”).
The standardised approach to land sector emission accounting is provided for the IPCC 2006 Guidelines for National Greenhouse Inventories. There are several chapters dedicated to forest and non-forest accounting associated with carbon sequestration in vegetation, but “Volume 4: Forests” is the definitive guide with respect to land management. Associated with this guidance is the approach each nation takes with its unilateral decision to account for, or to exclude emission sinks and sources from its accounting report.
Historically, Australia has chosen to account for sinks and sources as identified by Article 3.3 of the Kyoto Protocol, applying the guidance of the IPCC Volume 4. This effectively covers all “forests” In Australia on lands that were clear of vegetation at January 1 1990. Australia elected to exclude emissions from Article 3.4 sinks and sources (including vegetation that would not reach the definition of forest) in the first commitment period of the Kyoto Protocol (2008-2012). This decision was reversed at international negotiations for the 2013-2020 reporting period, with Article 3.4 now being
“Kyoto compliant” and a measured set of emission sinks and sources in Australia. This means in effect that if a project is able to apply a methodology that measures non-forest carbon sequestration (such as revegetation of small shrubs, grasses and other non-forest vegetation), it should be able to use those credits in a way that the Government acknowledges to reduce Australia’s net emissions.
Alongside Australia not reporting Article 3.4 non-forest revegetation in the land sector reporting, emissions from wetlands and coasts were poorly represented in the IPCC measurement and estimations guidance. This was due to the scientific and technical problems of dealing with variability of the biogeochemical processes that drive change in emission sinks and sources related to wetlands.
The IPCC has recently released the 2013 Supplement to the 2006 IPCC Guidelines: Wetlands. This is the new and updated methodological guidance on lands with wet and drained soil and constructed wetlands for wastewater treatment. The treatment of wetland emission sinks and sources is somewhat uncertain from a crediting perspective at present, and this is discussed in more detail in Section 6 of this report dealing with the amendments to legislation being proposed at the time of development of this report.
The international conventions that drive Australia’s emission reporting have direct implications for project scale reporting of carbon stock change. At the project level, any carbon stock change needs to be consistent with the rules applied at the national level. This has direct implications for the development of project scale carbon stock change estimates in this report.
14
3. Project level carbon forecasting
The purpose of this section of the project is to use a defensible approach to determine total amount of carbon sequestered:
• to date by the CLLMM plantings,
• into the future by the CLLMM existing plantings, and
• by planned future plantings lifetime carbon sequestration.
This requires an understanding of the approaches taken to determine carbon stock change in vegetation under both legislated and regulated voluntary carbon markets. The greenhouse gas accounting is done at a “project” level where the project has a clearly defined physical and activity boundary, and the sources and sinks of emissions within the project boundary are identified and can be quantified.
Best practice guidance on project level GHG accounting is well identified by The GHG Protocol for Project Accounting (WRI & WBCSD; 2004). The GHG Protocol is reflected by the CFI legislation in Australia. Of importance to this project at the pre-feasibility & investigations phase is the need for project level accounting to be relevant, complete, consistent, transparent, accurate and conservative.
The findings of this report are judged against these standards.
For the purposes of this project, the project boundary would include the sinks and sources of greenhouse gas emissions identified in Table 1.
Table 1. Project emissions accounting boundary for CLLMM project (including terrestrial forest, non- forest land and aquatic vegetation)
Carbon pools and emission sources Greenhouse gas Live above-ground biomass Carbon dioxide (CO2) Live below-ground biomass Carbon dioxide (CO2) Dead plant material and debris Carbon dioxide (CO2)
Fuel use Methane (CH4) Nitrous oxide (N2O) Carbon
dioxide (CO2)
Fire Methane (CH4) Nitrous oxide (N2O) Carbon
dioxide (CO2)
Biogeochemical processes Biogeochemical processes associated with wetland draining and re-wetting are excluded, but this is only done for lack of available data and cannot be interpreted to be conservative.
Further guidance is required from the Australian Government on the relationship between project & national accounting rules and the new international protocols on wetland accounting.
15
3.1 CLLMM planting program and design
Over time, the CLLMM planting project reports have developed a greater level of consistency across reports and have eventually taken the general agreement as to what “zone” represents what biological zonation, rather than a project or site specific planting area.
The general form is based on the landscape “zonation” as per Figure 1.
Figure 1. Generalisation of landscape zones across the CLLMM project area.
3.2 Estimating carbon sequestration rates
A detailed report on carbon sequestration estimation is provided at Appendix 1. A summary of the approach is given here.
Assumptions
This project required a set of assumptions to be made in relation to the activities of the project.
1. There was a zero carbon stock baseline (i.e. the carbon stock change estimations do not take into account change in carbon stock change in vegetation already in existence when the CLLMM project was initiated). This differs from the current CFI regulations that discount to zero any carbon stock change prior to 1 July 2010.
2. All plantings within a specified estimation area occurred within 30 days of initiation
3. All lands are eligible “Kyoto” lands (i.e. were free of native vegetation at 31 December 1989) or have been continually clear of vegetation for the last 5 years.
4. All plantings were made by direct seeding or using tube stock, rather than by assisting natural regeneration.
5. Lifetime sequestration of planted vegetation is maximised at 30 years, and further carbon stock change is incrementally small after this point and can be assumed to be zero in the absence of disturbance events.
6. Assumption regarding canopy forming plants is that if they were present in the original planting plan, they would achieve forest condition as the natural environment & rainfall wold ordinarily naturally configure to forest state.
16 7. While there were some plantings intended to create open grassland or shrub land, with most sites having large proportion of canopy forming plants at initiation. It was assumed that information from project planting reports including number and identity of species planted could allow a determination to be made as to whether a “forest” would result or now.
8. Only planted area was used to assess carbon stock change rates.
The full data set of all project reports from all plantings for the CLLMM project and associated database information including GIS coordinates, species lists and planting plans for all project areas were supplied by the CLLMM project team. These pieces of information were used to determine the total areas planted. These data were then further disaggregated into the data classifications shown in Figure 2.
Plantings were divided into “year” classification with the expectation that all plantings within “year”
occurred within the planting season of a single year (e.g. June-September) and that is an approach that is consistent with a CFI methodology. The date of planting was estimated to be 1 September in the estimation year. The GIS database information was initially filtered to get all planting data for each given year of the project.
Project planting plans for each project were then used to determine whether or not the plantings in each planting area within the CLLMM project area were likely to be have the potential to attain “forest classification” (greater than 0.2ha area at >10m width, with the potential to reach >2m crown height at maturity with >20% crown cover ). This was based on a qualitative and semi-quantitative estimation of the species mix, and number of over story seedlings that were reported as being planted (where over story seedlings were represented at >200+ seedlings/ha). This information was combined with qualitative estimations. Given that significant local expert knowledge was applied in the planning process, it was assumed that where project report indicated a “tall shrub land” or “open forest grassland” was expected to be the outcome of the planting, that planting area was classified as forest for the purposes of this analysis.
The project planning report information on planting zones could be used to be the basis of different planting activities based on differing soil and vegetation assemblages that would be recognised as different “carbon estimation areas” or CEAs in the language of the Carbon Farming Initiative.
All “forest area” was assessed for carbon stock change over 25 years using the Australian Government Reforestation Modelling Tool.
All plantings that did not meet the forest classification are classified here to be “revegetation”. The terrestrial non-forest carbon sequestration from the period 2011 to 2040 (29 years) was assessed using the DEWNR carbon sequestration from revegetation tool (the Hobbs model).
Non-forest carbon stock change estimates were assessed using technical report information as provided by Hobbs model, where the setting “percentage of trees” in planting was set to zero, representing a low-shrub revegetation estimate.
Non-forest aquatic vegetation carbon sequestration rates were assessed by the use of locally derived empirical sequestration rates as estimated by Sullivan et al. 2013.
Details of total areas for each classification are presented in Table 2.
17 Figure 2 Data breakdown used to undertake carbon stock change modelling.
Table 2 Estimated areas of each classification of different planting types over time. Data all presented in hectares (ha). Areas are rounded for presentation purposes.
Year Forest Non-forest
terrestrial
Non-forest aquatic
2010 120 5 0
2011 478 49 0
2012 294 166 0.38
2013 295 39 0.3
2014 391 37 0.32
Total areas (hectares) 1578 295 1
Once areal extents were determined for each planting type, then total carbon sequestration to 2040 was determined on an annual basis. This was done for forest type using both Reforestation Modelling Tool (RMT) and the SA model for estimating carbon sequestration rates for endemic vegetation associations developed by DWENR (Hobbs et al. 2013).
The RMT takes into account all of the carbon pools that would be associated with an environmental planting, and assume there is some understory plantings to enhance the “biodiversity” effect. Data used to establish each year’s model run in RMT were area planted in that year, using a low density (<800 stems/ha) planting number. No detailed event activities other than initial weed treatment and planting were programmed in to the event log file. The geographic coordinate for rainfall, soil types and native vegetation growth maximum for the area was centred on Meningie (35.6883° S, 139.3378°
E) for the purposes of this analysis. Given these simple assumptions, the outcome of the analysis only represents a coarse estimate of likely carbon outcomes at the aggregate level, and does not reflect a site specific or carbon estimation area level of accuracy. Given the location’s annual average rainfall, the carbon forecasts are likely to be conservatively low.
The Hobbs model is focussed on extrapolation from real data surveyed across SA, and is available in an Excel spreadsheet format from http://www.environment.sa.gov.au/files/0dcbe5c6-337f-4810-
18 a160-a26d00f7d8f0/carbon-sequestration-from-revegetation-estimator-version1-gen.xlsx. The full details of how carbon stock change data were derived are presented in Hobbs et al 2013. The tool was used to determine the average annual carbon sequestration for an “average” hectare of land in the area “Meningie”, with all other default settings accepted. The values for environmental plantings in Hobbs have been incorporated into the approved methodology “Quantifying carbon sequestration by permanent native mixed species environmental or mallee plantings using the Full Carbon Accounting Model”.
Non-forest terrestrial for grassland plantings were estimated using the default values in Hobbs model by setting the planting density of trees to “0”, setting the vegetation description to “Shrubby Environmental Planting”, and the planted tree density to 200/ha. This is non-conservative in situations where the planting was actually a grassland and not a shrubby environmental planting.
Estimates of carbon sequestration amounts in aquatic non-forest vegetation plantings are simply based on the range of data developed by Sullivan et al. 2013.
3.3 Results of carbon stock change assessment
The results of the data analysis and carbon sequestration modelling based on various areas of different planting types yield the data presented in Table 3.
The largest area of total plantings was assessed to be “forest”, at 1,578 hectares, or around 84% or total planted area. The non-forest terrestrial plantings represented just over 15% of total planted area, and the non-forest aquatic plantings (S. validus) only took up around 1 hectare, or less than 1% of total planted area. There were no records of Ruppia spp. plantings, although it is understood that there were plantings of these species within the region over the time of the project.
On an annual per unit basis, the RMT suggests that each hectare of low density environmental planting in the Meningie area will sequester 0.45 tonnes carbon per year out to 2040, or an annual average of 1.5 tCO2e per hectare. It must be remembered that this model is poorly locally calibrated. The model suggested a total carbon sequestration of plantings to date of 2,750tCO2e. This is likely to be an underestimate of actual sequestration that has occurred to date.
The Hobbs model, using locally calibrated data, suggests an annual average carbon sequestration rate of 2.1tC/ha/year, or 7.71 tCO2e/ha/year. This number is significantly higher than the number forecast by RMT for the same location, and is likely to be a function of the poor calibration of RMT. Using the annual average sequestration rate over the lifetime of the plantings, it is suggested that the sequestration of all plantings to date is on the order of around 300,000tCO2e. This is likely to be an overestimate in early years as plantings establish, but actual tree growth would be very likely to meet the predicted over a 30 year period in the absence of catastrophic losses to fire/disease/storm events.
The terrestrial non-forest sequestration rate was estimated to be 1.3tC/ha/yr, or 4.7tCO2e/ha/year. It is likely to be reasonably representative of the situation for shrubby environmental plantings, but unlikely to be representative of carbon sequestration rates in grasslands.
The smallest area of vegetation type replanted, aquatic non-forest plantings, represented by Schoenoplectus validus reeds is expected to sequester carbon at a rate between 500 – 1000kgC/ha/year while rehabilitation is ongoing, and this is not expected to vary much with changing
19 species identity. This equates to a range of 1.8-3.9tCO2e/ha/year. Rates of seagrass carbon sequestration were not considered by this study.
Table 3. Total carbon sequestration over 30 years for each vegetation type planted by CLLMM project (assuming only 85% of modelled is credited)
Vegetation type
Model Area tCO2e total production to 2040
Confidence Challenges
Forest-RMT RMT 1,578 69,756 High
(extremely conservative)
Model doesn’t
take into
account real conditions and is excessively conservative Hobbs 1,578 297,688 High (relatively
conservative;
based on
relevant data)
Robust, locally
data and
analysis
Non-forest terrestrial
Hobbs 295 ~40,000 Limited Disentangling
“shrubby revegetation”
data from
“grassland”
data Non-forest
aquatic
South Cross University (Sullivan et al.
2013)
1 52-111 Reasonable Large range but
locally relevant data source
Seagrass (e.g.
Ruppia spp.)
Not recorded Requires investigation
Local data acquisition
3.4 Summary of carbon stock change forecast and way forward
It can be seen that the plantings undertaken by the CLLMM project have resulted in significant carbon sequestration., and for the future sequestration to be of real importance. Different models of carbon stock change forecast will give different carbon stock change estimates. Clearly in this case, the
“Hobbs” model provides a higher estimate of total carbon sequestration compared to the RMT. It is likely that the Hobbs model provides a more realistic estimate, given it is locally calibrated using environmental plantings rather than providing estimates based on more coarse local assumptions as the RMT does.
Further, project level accounting did not take into account biogeochemical processes that would impact be impact by hydrological wetting and drying cycles of wetlands. This may be an important
20 source of emissions or emission reductions, depending on the anthropogenic influences at play. Whole of project area carbon accounting is considered in more detail in the next section.
4. Application of carbon quantification methodologies &
project level carbon accounting
With an understanding of the likely “biological” responses of the system to rehabilitation in terms of rates of carbon sequestration over a variety of different vegetation types, this study turns to focus on carbon market and policy considerations. This is done with a view to answering the question “is it possible to crystallise the value of the carbon sequestration potential of the CLLMM plantings?”.
Ideally, when an environmental planting project is established with a view to earning carbon credits, it would be designed to conform to all of the methodological project design requirements from the outset. While it was clearly an intent of project owners and developers (as seen in CLLMM project justifications, applications and project reports) to achieve a carbon sequestration and climate benefit, there was only limited investigation into how to participate in carbon markets at an early stage.
In the absence of these prior considerations, we here give consideration to which methodology might be available to apply to the CLLMM environmental plantings to enable plantings to be able to earn carbon credits. These credits may be sold to create ongoing revenue for forest and vegetation management, or development of additional reforestation and revegetation activities in the region, with additional regional economic development benefits.
This report provides information of relevance to “applicability conditions” that describe when a CFI methodology can be applied, and consider the relevance of the methodology to the CLLMM plantings.
This is done with a practical view of attempting to determine whether or not it is possible to create enduring economic value based on carbon sequestration on different lands as managed by the CLLMM project.
The consideration is broadened to the “whole of ecosystem” (i.e. beyond just “terrestrial reforestation”) for a more thorough perspective of all of the potential carbon sinks and sources of relevance to the CLLMM aims of riverine recovery and rehabilitation, in line with this project’s aims of evaluating environmental economic benefits.
4.1 Environmental Plantings
The unique aspect of the CFI Environmental Plantings methodology when compared to other carbon sequestration methodologies is that it requires the use of a computer model to estimate carbon sequestration. The CFI Environmental Planting methodology uses the Reforestation Modelling Tool (RMT). RMT is a restricted version of FullCAM (or Full Carbon Accounting Model), the carbon accounting system that the Australian Government use to determine land use land use change forestry (LULUCF) emissions at the national level. The RMT is designed to be simple to use, with a restricted level of variables that can be modified and will give a conservative output estimate of carbon stock change forecast. This is the model that was applied in carbon sequestration forecast modelling in the previous section of this report.
21 To determine whether or not a project activity is consistent with the requirements of the Environmental Plantings methodology, the project proponent needs to be able to show that the planted area, for five years prior to project activity either:
• has been used for grazing, pasture management, cropping, nature conservation, settlement or
• has not been used for any purpose, has been non-forested land and has not had woody plants removed, other than known weed species required to be cleared by law.
The CLLMM projects all generally would be seen to comply with this condition, but individual circumstances may vary.
The environmental planting must have been established by direct seeding or planting; and (b) contain trees that, on the project area, have the potential to attain a crown cover of at least 20% across the area of land and a height of at least 2 metres (that is, attain a “forest” condition). This requirement has been assessed by the current project, and the total area of CLLMM plantings that are or should be able to achieve this condition was estimated in this report to be 1,574 hectares.
Ripping and mounding must not be used for site preparation over more than 10% of a carbon estimation area if, according to the CFI rainfall map, the area receives greater than 800mm long-term average annual rainfall. This condition will relate to a detailed investigation on a case-by case basis, however the majority of all project sites would probably meet this requirement given regional rainfall characteristics.
Each carbon estimation area must have uniform site characteristics, including soil type, aspect, and position on slope. In terms of species composition, each carbon estimation area needs to have been be planted or seeded with the same species or combination of species and be established and managed using the same methods, including preparation prior to planting, planting, thinning, weed control treatment and the application of fertiliser. The detailed project site plans for each CLLMM planting generally provide enough evidence to be able to justify that the CLLMM project planting zones can be classified as discrete CEAs according to the CFI methodology.
The Environmental Planting methodology requires and understanding of the total emissions of greenhouse gases associated with this project. This would be expected to include fuel used in transport, delivery and operation of the project (land preparation, tree planting and maintenance). In terms of being able to quantify greenhouse gas emissions from fuel use associated with project development, the current Environmental Plantings methodology requires fuel use data to be provided in project reporting as invoices and vehicle logs. It is currently unclear whether or not these data are available, and lack of these data will preclude the CLLMM projects from applying to be granted carbon credits from the Clean Energy Regulator.
4.2 Afforestation & Reforestation
The Afforestation & Reforestation (A&R) methodology was developed to meet the needs of commercial plantation and carbon project developers who have very large areas of carbon plantings.
The key difference between the A&R methodology and the Environmental Plantings methodology is the use of direct measurement of carbon stocks in the A&R methodology as opposed to the modelled estimates used under the Environmental Plantings methodology. The level of statistical accuracy and
22 precision required by the methodology will lead to physical sampling (including destructive sampling) would be expensive to undertake.
The reason that private “carbon focused” developers would seek to apply a direct measurement approach rather than the more cost effective modelled approach offered by the Environmental Plantings methodology is due to the relative conservatism of the Environmental Plantings methodology. The Environmental Plantings methodology RMT is intentionally designed to err on the side of caution when forecasting or predicting carbon sequestration rates. The Environmental Plantings model will always predict there to be less carbon sequestered than there actually is sequestered. This then creates a tension in cost: benefit of using a modelled and direct measurement approach to quantify the number of credits that should be issued to a project. A direct measurement approach will likely lead to more credits issued compared to the modelled approach. The modelled approach is simpler and less expensive to implement. The most cost effective solution (i.e. lowest cost per credit issued) will vary on a project by project basis.
Typically, carbon project developers in the afforestation/reforestation area will seek to grow high yielding monocultures that maximise carbon sequestration rates per planted area. Akin to forestry plantations, such plantings seek to maximise tree growth at the expense of structural and species diversity. As a result, the plantings have very few of the environmental and ecological values achieved by the CLLMM plantings. So while there may be an economic benefit from undertaking direct measurement in a high-yielding carbon forestry project, it’s unlikely to be true for plantings undertaken to primarily deliver a biodiversity benefit alongside its carbon sequestration benefit.
However project developers who are seeking to maximise financial returns from carbon plantings (as opposed to deliver broader environmental benefits) will seek to minimise the level of conservatism and maximise credit issuance. The cost-benefit ratio and sensitivity assessment of whether or not it would be more advantageous for the CLLMM project to go down the direct measurement approach rather than the modelled approach is beyond the scope of this study. It is unlikely for the CLLMM project plantings to be of a scale worth further investigation.
4.3 Quantifying carbon sequestration by permanent native mixed species environmental or mallee plantings using the Full Carbon Accounting Model
The tension between cost effective monitoring and confidence in reporting conservatism is the reason there is often a preference to use a “model” to forecast and grant credits. This was the reason behind the work undertaken by Hobbs et al. (2013) in seeking to gain more accurate understanding of actual carbon sequestration rates in environmental plantings in SA to better calibrate RMT/FullCAM. So while RMT as applied by the Environmental Plantings methodology meets the Australian Government’s need for project level accounting requirements of conservatism, such an approach does not provide best value for project proponents seeking to create value in environmental plantings by being so conservative in crediting.
Obviously from the results of this project assessment, the RMT is excessively conservative compared to the outputs of the Hobbs model, and would issue just less than 25% of the credits the improved FullCAM methodology would credit for exactly the same planting in the same location. Obviously from a cash flow and project revenue perspective, a greater level of issuance from the same or similar cost is preferred.
23 The data provided by Hobbs have been integrated into the “parent” model of the RMT, FullCAM and approved as the new methodology “Quantifying carbon sequestration by permanent native mixed species environmental or Mallee plantings using the Full Carbon Accounting Model”. As such, this would allow increased crediting and limited new cost compared to development under the new improved methodology than the old environmental planting/RMT model.
However, the methodology has not yet been made into a determination.
It remains to be seen how methodologies that are “in transition” between the CFI under the previous Government, and the CFI as amended by the current Government as the updated methodology using Hobbs et. al’s data is. If the approved methodologies are able to transition promptly to the new CFI arrangements, then there may be value in promptly seeking to register projects under the favourable new methodology than the excessively conservative Environmental Plantings methodology.
4.4 Verified Carbon Standard Coastal wetlands methodology
The Verified Carbon Standard (VCS; the global benchmark non-Government carbon credit awarding scheme) methodologies can be used to earn carbon credits under a “voluntary” arrangement, away from any government mandated credit award schemes such as the CFI. It needs to be made clear that at present, credits from a VCS registered project cannot be used for sale to the Emission Reduction Fund. However, the VCS presents an alternative pathway for earning credits if it is seen that the CFI is restrictive to project proponent needs. Credits earned through the application of “voluntary standards” such as those governed by the VCS could be sold to companies in Australia or overseas who are seeking to reduce their emission profile or to go carbon neutral. In Australia the National Carbon Offset Standard (NCOS) allows the use of VCS credits to achieve “carbon neutral status”.
Several projects have previously been registered in Tasmania under a VCS methodology.
There is currently a VCS approved a methodology for coastal wetland creation in January 2014. This methodology looks to quantify carbon sequestration benefits associated with improved management of coastal aquatic ecosystems through slowing water flow and increase vegetation and silt accretion.
However, while it would seem to be directly relevant to carbon sequestration rates as described by Sullivan et al. (2013), the VCS seem to have a current policy of not allowing credits to be earned in the situation where the Australian Government also may seek to lay claim to that carbon benefit. As such, without clarity on where the Australian Government sits with respect to measurement of the carbon sequestration associated with rehabilitation of the CLLMM, it is unlikely for the VCS to allow a project to be registered in this situation without greater information.
This should be a point of further clarification between the VCS and Australian Government.
4.5 IPCC Guidance on wetland carbon accounting
The IPCC Wetland Supplement Guidance (2014) was developed to allow National Greenhouse Gas Emission Inventory builders a starting point to assess sinks and sources of greenhouse gas emissions that can be measured and managed by human interactions and activities in the environment. The IPCC Guidance directs users in the first instance to the Ramsar database of the Ramsar Convention for information of relevance to classify wetland type and to begin to assess greenhouse gas emission and sequestration rates. This is important, given the recognition of the CLLMM region under the Ramsar Convention.
24 This is an important platform for data for environmental emissions sinks, sources and default factors that enable consistent greenhouse gas reporting between countries and consistency across time series. Now that this guidance is available, a detailed study should be undertaken to apply the new IPCC wetland Guidance in the context of the CLLMM project area. This will give a more definitive
“project level” understanding of how environmental rehabilitation is influencing carbon sinks and emission over time. Applying the new guidance will put the CLLMM team at the international forefront of reporting emissions sink and source dynamics. This is important given the international significance of the CLLMM wetlands. This also has important implications at the national level. The Wetlands Guidance also provides advice for the most appropriate ways to develop locally relevant and locally derived real data (where possible or feasible, or where it is expected that the sink or source is significant) rather than use default values. Here, the research work undertaken by Sullivan et al (2013) is important to whole of CLLMM greenhouse gas inventory reporting.
Further, the IPCC guidance provides both default factors and scientific research methods to derive locally relevant data for reporting the effect of wetting and drying cycles in carbon sequestration and emissions avoidance. These data were alluded to by Sullivan et al. 2013 as an important “next research step”. The release of the IPCC guidance is critical information to further guide more detailed emission accounting.
The CFI legislation will always seek to reflect the National Greenhouse Gas Emission Inventory (NGGI) data sources and default factors so that emissions sinks and sources reported at the CFI project level can be reflected at the level of the national accounts. As such, the release of the IPCC Guidance for wetlands marks a critical point in greenhouse gas reporting standards for important wetlands such as the CLLMM region.
At this point, it not possible to estimate the scale or value of how changed wetting and drying cycles will specifically impact carbon sequestration or emission rates in the CLLMM region. However, as a general principle, if wetland systems are artificially raised or dried out by restriction of natural immersion and flows, they will be a net source of greenhouse gas emissions. If they are re-wet or immersed through reinstatement of the natural hydrological cycle, they will tend to increase carbon sequestration and have reduced greenhouse gas emissions relative to their degraded state. Reversal of human induced emissions cause by drying could then deliver an emission avoidance benefit. This should be carefully considered in future research and commercialisation activities.
4.6 Summary of project level accounting issues and way forward
What is clear from the review of project level accounting of emissions there are several potential methodologies that could be applied under the Carbon Farming Initiative. The most prospective for use to attempt to create carbon credits would be the “Quantifying carbon sequestration by permanent native mixed species environmental or mallee plantings using the Full Carbon Accounting Model”. In general, all of the applicability conditions of the methodology could be met by the project.
It is currently unclear as to exactly how a project could be put up under the methodology, given current political uncertainty relating to proposed changes to the CFI legislation currently proposed.
It is clear that alongside the use of a CFI methodology to earn carbon credits, a broader assessment of the whole of ecosystem effects of improved hydrological conditions and rehabilitated environmental conditions should lead to further emissions avoidance and carbon sequestration. The recently
25 released international guidance on emissions accounting for wetlands should be implemented to develop more detailed understanding of the importance of the CLLMM project to ecosystem carbon accounting.
26
5. Project development costs and possible returns
General context
It is important to note at the outset of this section of the report that the carbon credits that can be awarded to project proponents as considered by the previous section, Australian Carbon Credit Units (ACCUs) are deemed to be financial products. This means activities relating to these units are regulated by the Australian Securities & Investment Commission (ASIC). A concise description of the nature of these units is available here (http://www.cleanenergyregulator.gov.au/ANREU/Concise- description-of-units/Australian-carbon-credit-units/Pages/default.aspx). Advising, dealing, arranging or brokering services in relation to these units generally requires the party providing the services to hold an Australian Financial Services Licence. More details on carbon trading and financial services law can be found at the ASIC website
(http://www.asic.gov.au/asic/ASIC.NSF/byHeadline/ASICs_role_in_carbon_markets). That background information is provided to ensure that parties interested in further development in this arena are aware of the regulatory environment.
To provide a full cost of development and cash flow forecast based on expected revenue from carbon credit sales can only be done in a general fashion regarding the “whole of the Lakes Alexandrina, Albert and Coorong wetlands or the River Murray Restoration in general” project. To provide further detail at the scale of an individual property may be misconstrued by private landholders as advice on whether or not to participate in a scheme. The work here, as identified by the report disclaimer, is general in nature and the findings are not specifically applicable to any individual circumstance.
Development and implementation costs versus possible revenue
A range of costs will be incurred through the development of a project seeking to crystallise value associated with carbon sequestration in vegetation delivered by the Riverine Restoration project.
Taking the outcomes of the carbon sequestration modelling (section 3) and methodology & policy assessment (Section 4), this project forms the position that the “Quantifying carbon sequestration by permanent native mixed species environmental or mallee plantings using the Full Carbon Accounting Model” presents the optimal balance of cost effective development and reasonable volumes of credit issuance.
The following assessment looks at the cost of development of a CFI project under this methodology, and provides a rough estimate of cost: benefit ratio of development.
Assumptions
• Project reports once every four years on average over a 15 year crediting period
• Total volume of credits sold 190,000
• All eligible forest areas included in CFI project
• Costs and revenue are not indexed in these calculations
• Flat carbon price of $15/ACCU
• 10% of issued credits are withheld from sale: 5% by the Australian Government and 5% by the project owner as self-insurance against loss events (retained as an asset but not valued in this simple assessment)
• No cash flow viability assessment has been undertaken
• No sensitivity assessment has been undertaken on key cost variables
• No optimisation testing of frequency of credit issuance has been tested